Products RailSys Product Family RailSys Enterprise Possession planning/ Operation of track possession

Possession planning / Operation of track possession

Operating engineering works

Perturbance management: When will your trains run according to the timetable again after a switch has been out of action for several hours? Is the building of additional infrastructure worthwhile to ensure the traffic will flow smoothly in spite of an engine failure? These and similar questions may be answered by entering timely blocked track sections into RailSys. Emergency timetables are able to be built within the timetable construction. You may even recognise immediately, with the help of the timetable simulation, which trains are related to the delay. This will also show if enough reserves exist to maintain the vehicle rotation.

Elaborating worksite traffic timetable: If you have to carry out construction in parallel to operation and need a timetable with delays as small as possible, this planning can be done with the help of RailSys. Trains affected by the blockage are recognised automatically and shifted to a neighbouring track. Hindrances due to oncoming traffic are also taken into consideration. This simplifies the planning for activities in restrictive conditions.

Several construction sites in your network? RailSys helps here too. You can block as many sections as you like on different routes at different times. You can keep track of the complex interplay of single blockings with the network display and clear markings in the graphical timetable. Due to this, you are completely free concerning the development of the best possible bypass timetable during the construction, even on other routes. Thanks to the integrated running time calculation you always know how much delay and the timing a train will receive in passing several construction sites on the way to its destination. You will achieve a high planning reliability with minimal delays. Your passengers will be grateful.

Construction site statistics: RailSys provides a detailed statistical evaluation of the timetable changes due to construction operations. An overview of the measurements is displayed in tabular form as well as a track layout. The delays of the single trains resulting from the bypasses is shown in this display.